What the Maintenance Agreement Covers
The RP Power Maintenance Agreement is the trouble-free way to ensure that your standby generator system will take care of you in a power
emergency. Under this agreement, our authorized, factory-trained technicians will perform the following tests and inspections using NFPA 110
suggested maintenance schedules as they apply to your system:
Fuel System
- Check Fuel Levels in Day/Main Tank(s)
- Test Transfer Pump Operation
- Test for Water and Contaminants
- Inspect Hoses, Piping and Connections
Lubrication System
- Check Oil Level
- Change Oil and Filter
- Inspect and Clean Crankcase Breather
Cooling System
- Check Coolant Level
- Test Protection Level
- Inspect Radiator Condition
- Inspect Fan Belt(s)
- Inspect Condition of Hoses and Piping
- Test Jacket Water Heater
- Inspect Ductwork, Louvers and Controls
Exhaust System
- Check for Leaks
- Drain Condensation Trap
- Inspect Hangers and Supports
- Check Insulation
- Check for Fire Hazards
- Inspect Flexible Sections
Battery Systems
- Clean and Tighten Battery Terminals
- Check Electrolyte Level and Specific Gravity
- Verify Charger Operation and Charge Rate
Electrical System
- Conduct General Inspections
- Inspect Wiring and Connections
- Test Operation of Safeties and Alarms
- Inspect Boxes, Panels and Cabinets
- Inspect Circuit Breakers and Fuses
Engine
- Perform General Inspection
- Service Air Cleaner
- Inspect Governor and Check Operation
- Inspect Ignition System
- Inspect Injection Pump
Generator
- General Inspection
- Check Voltage Regulator
- Inspect Bearing(s) and Grease if Necessary
Automatic Transfer Switch (ATS)
- Perform General Inspection
- Test Time Delays
- Test ATS Options
- Check Exercise Clock for Proper Operation
General Inspection of EPSS
- Check for Vibration, Leakage, Noise, Temperature or Deterioration
Functional Test
- Record Running Time Meter Reading
- Simulate Normal Power Failure
- Check TDES
- Transfer Load to Generator
- Record AC Voltage, Amperage and Frequency
- Record Oil Pressure and Battery Charge Rate
- Restore Normal Power to Allow Minimum Run Time of 30 Minutes
- Record TDEN
- Record TDEC
|
|